When the first colocation quote arrives, many teams only look at the "price per rack". For GPU servers that number is not enough to compare offers: two quotes with the same rack price can differ widely once power, connectivity and services are added. This article lists every line item so you can read a quote properly.

1. Committed power (kW): the biggest line

GPU servers draw a lot of power: an NVIDIA DGX B200 system is rated at about 14.3 kW max. GPU colocation is therefore usually priced per committed kW per month, including cooling and redundant infrastructure. Ask:

Per-kW pricing varies widely by market. For example, CBRE reports Singapore as the most expensive Asia-Pacific market, averaging about $403 per kW per month in Q1 2026.

2. Space: rack, half rack or cage

Space can be billed per 42U/47U rack, per half rack, or as a locked cage for larger clusters. With GPUs, space is rarely the limit; the real limits are power and heat per rack (see how many GPU servers fit in a rack).

3. Connectivity: bandwidth, IPs and cross-connects

4. Operational services

5. One-time fees and contract terms

Example: monthly cost of a 15 kW rack

Assume one 8×B200 server in a 15 kW rack. With the illustrative assumptions below (not an FPT quote), the total is about $5,733/month:

Example monthly colocation cost for a 15 kW rack: power and space $2,700, bandwidth $400, cross-connect and remote hands $300, staff $1,500, maintenance about $833
Assumptions: 15 kW × $180/kW/month; bandwidth $400; cross-connect + remote hands $300; allocated staff $1,500; maintenance $10,000/year.

Power and space make up nearly half; the rest is connectivity and your own operating costs. That is why a comparison with GPU cloud must use total cost of ownership, not just rack price. See the full analysis in 3-year TCO: colocation vs GPU cloud.

Tips for comparing quotes

  1. Normalise everything to one unit: total cost per committed kW per month.
  2. List one-time and recurring charges separately.
  3. Ask up front for cross-connect, remote hands and overage pricing.
  4. Check the SLA and service credits (see the colocation contract checklist).
Send your server configuration (node count, nameplate power, bandwidth needs) to receive a detailed FPT Data Center quote, line by line.

Frequently asked questions

Is GPU colocation priced per rack or per kW?

For GPU servers, pricing is mainly based on committed kW per month (including cooling and redundant infrastructure); space may be billed per rack or bundled into the power price.

Which items are often missed in a colocation quote?

Cross-connects, remote hands, one-time installation fees, power overage, charges for the redundant B feed and annual escalation clauses.

How much does colocation cost for one 8-GPU server?

It depends on market and contract. With the illustrative assumptions in this article (15 kW at $180/kW/month plus bandwidth, operations and maintenance) the total is about $5,733/month. Request a real quote for your configuration.

References

Need infrastructure for your GPU cluster?

Đỗ Quốc Duy • +84 917 755 725 • DuyDQ12@fpt.com

📞 Call: +84 917 755 725