ANSI/TIA-942-C-2024 Rated-3
Constructed-facility certification: Rated-3 for architecture, telecom, electrical and mechanical
- Issued by
- EPI Certification
- Validity
- 23 Dec 2025 – 22 Dec 2028 · No. TIA942VN251223002
Host your GPU cluster in FPT's Tier III data centers in Vietnam — high-density power, multi-layer redundancy, carrier-neutral connectivity and a 24/7 operations team. You focus on training models; we take care of the infrastructure.
A single GPU server can draw from a few kW to more than 10 kW — many times a conventional server. Office server rooms and legacy facilities struggle with power, cooling and networking.
Dual A/B feeds, high-capacity PDUs, flexible 4–15 kW/rack with room to go higher for dense GPU configurations.
Hot/cold aisle containment, with rack layout and cooling designed around each cluster's real power density.
N+1, N+2 and 2N architecture for power, UPS and generators keeps systems running even during maintenance.
Carrier-neutral model with high-speed cross-connects to link your GPU cluster with clouds and offices.
Multi-layer access control, 24/7 CCTV, and private cages/suites for customers who need physical isolation.
On-site engineers handle installation, cabling, part swaps and reboots — no need for you to be there.
From a few inference servers to large training clusters — per rack, cage or private suite, ready to scale as demand grows.
* Plans are indicative. Configuration, location and pricing are quoted based on your equipment and contract term.
More than 17,000 m² and over 7,000 racks across Ho Chi Minh City and Hanoi. Combine both regions for disaster recovery (DR) of your data and AI models.
Opened on 20 August 2025: 8 floors, designed for AI and cloud infrastructure with high power density. Lot T2-5, Road D1, Saigon Hi-Tech Park, Tang Nhon Phu Ward.
Tan Thuan EPZ, Tan Thuan Ward — operated to Tier III standards, convenient for southern Vietnam.
17 Duy Tan and 10 Pham Van Bach, Cau Giay Ward — serving northern Vietnam, ideal for parallel deployments or DR.
Six operational submarine cables land at Vung Tau, Quy Nhon and Da Nang. FPT Telecom has invested in the AAG and APG cables and in the ALC cable with a landing station in Da Nang.
International certifications and Vietnamese technical regulations for the FPT Fornix data centers. Click an image to view the original.
Constructed-facility certification: Rated-3 for architecture, telecom, electrical and mechanical
Green building – BD+C: Data Centers
Information security management for data center services (colocation, managed services); cloud services with ISO/IEC 27017 & 27018 controls
Business continuity management for data center services: colocation and managed services
Service provider – scope includes data center colocation and Fornix Private Cloud
Security · Availability · Processing Integrity · Confidentiality – independent audit report under AICPA standards
Quality management – confirmation letter for the completed surveillance audit; certificate pending issuance
Approved under Decree 85/2016/ND-CP and TCVN 11930:2017 after appraisal by the Ministry of Public Security
Declarations of conformity with Vietnam’s national regulations on earthing and lightning protection for telecom facilities
Certificate images are for reference. Contact us for full copies or the SOC 2 report (shared under an NDA).
Own GPUs for model training and need a stable home with predictable costs instead of long-term cloud rental.
Run AI on-premise with data stored in Vietnam, meeting compliance and audit requirements.
Scale compute capacity quickly and deploy large GPU clusters in Vietnam.
Node count, GPU type, power draw, network and storage needs.
Rack placement, power and cooling plan, and a detailed quote.
Clear service commitments with flexible terms.
Equipment receiving, rack & stack, cabling, power and network testing.
Continuous monitoring, Remote Hands and always-on technical support.
Services are provided by FPT Telecom International (FTI); you work with one dedicated consultant from site survey to handover.
Công ty TNHH MTV Viễn thông Quốc tế FPT (FTI)
A member of FPT Telecom, delivering telecom and data center infrastructure for businesses and organisations in Vietnam and abroad.
🏆 Vietnam Technology Excellence Award 2024 – Data Center & Telecommunications category
Data Center & digital transformation consultant
Over 5 years advising customers on data centers and digital transformation solutions: from requirement surveys and power/cooling sizing for GPU clusters to connectivity design and post-handover support.
Fornix HCM02 is certified ANSI/TIA-942-C-2024 Rated-3 (EPI, Dec 2025) and LEED v4 Gold (Nov 2025). All four data centers — HN01, HN02, HCM01 and HCM02 — are certified to ISO/IEC 27001:2022 (TÜV NORD), ISO 22301:2019 (Bureau Veritas) and PCI DSS v4.0.1 (SISA). HCM02 is approved at information-system security level 4. See the certificates in the Certifications section.
With colocation you own the GPU servers and host them at FPT Data Center; FPT provides space, power, cooling, network and operations. It suits continuous, long-term GPU use where you want full control of the hardware. For short-term flexibility, FPT also offers GPU Cloud services you can combine.
It depends on each server's configuration and actual power draw — an 8×GPU server typically needs more than 10 kW. Our engineers will calculate from your equipment specs and recommend the optimal nodes per rack with sufficient power and cooling. Read more: How many GPU servers fit in one rack?.
Typically by number of racks (or cage area), committed power (kW), bandwidth, cross-connects and add-on services. Contact us for an exact quote for your configuration. Read more: GPU colocation pricing explained.
Yes. You register authorized personnel under our security procedures. Our 24/7 Remote Hands service can also handle physical tasks so you don't have to be on site.
For standard configurations with available space, installation can be completed within a few weeks of signing. Very high-density cage/suite projects follow a dedicated timeline.
Practical notes on colocation, power, cooling, AI chips and industry trends.
The second-fastest-growing digital economy in Southeast Asia, data center capacity set to grow nearly six-fold by 2030, a location between Singapore and Hong Kong, six subsea cables with a 15-cable target and new incentives — plus the power-price and cable risks to plan for.
Read more →By 2029, AI inference may overtake training, 600 kW racks and 800 VDC power arrive, and electricity becomes the number-one constraint. A year-by-year roadmap based on IEA, JLL, Gartner and NVIDIA data — and what it means for businesses in Vietnam.
Read more →A line-by-line breakdown of a GPU colocation quote: committed power, space, bandwidth, cross-connects, remote hands, one-time fees and escalation, with a worked example for a 15 kW rack.
Read more →