Trends 9 min read

Data center outlook for the next three years (2027–2029): power, rack density and AI inference

QD Đỗ Quốc Duy · Data Center & Digital Transformation Consultant, FPT Telecom International
Key points: Data center outlook for the next three years (2027–2029): power, rack density and AI inference
Key points: Data center outlook for the next three years (2027–2029): power, rack density and AI inference

Our article 7 trends shaping the data center industry covered the big shifts. This one puts them on a 2027–2029 timeline with concrete forecasts, then turns them into actions for businesses planning GPU infrastructure.

The picture to 2030: demand doubles

According to the International Energy Agency (IEA), data centers used about 415 TWh of electricity in 2024, around 1.5% of global consumption. In the Base Case this rises to about 945 TWh by 2030 — slightly more than Japan uses today — and could reach about 1,200 TWh by 2035. Electricity use by accelerated (GPU/AI) servers is projected to grow about 30% a year.

Chart of global data center electricity use according to the IEA: 415 TWh in 2024, 945 TWh in 2030 and about 1,200 TWh in 2035
Global data center electricity use in the IEA Base Case.

On capacity, JLL expects global data center capacity to nearly double from 103 GW to 200 GW by 2030, about 14% a year. Asia-Pacific grows from 32 GW to 57 GW, with colocation the fastest-growing segment at about 19% a year.

Year by year, 2027–2029

Data center roadmap 2027 to 2029: inference overtakes training, 600 kW Kyber racks, hybrid cooling, national data center, new subsea cables
Milestones to watch in 2027–2029 (planned dates may change).

2027: inference overtakes training, racks head to 600 kW

2028: hybrid cooling spreads, national infrastructure investment

2029: liquid cooling and connectivity accelerate

The five forecasts that matter most

1. Power sets the pace

JLL says speed to power is now the primary site-selection criterion, and some operators are funding their own generation and battery storage (BESS) rather than waiting for the grid. For colocation customers, committed power will become an increasingly scarce resource.

2. Rack density rises exponentially

Power chart: DGX H100 server 10.2 kW, GB200 NVL72 rack about 120 kW, Rubin Ultra NVL576 rack about 600 kW in 2027, 800 VDC architecture up to 1 MW per rack
From a ~10 kW 8-GPU server to megawatt racks.

An 8×H100 server draws up to 10.2 kW; a GB200 NVL72 rack about 120 kW; a 2027 Kyber rack about 600 kW. Most businesses in Vietnam still deploy standalone 8-GPU servers, but should pick a facility that can raise power per rack as they move to new GPU generations (see how many GPU servers fit in a rack).

3. Liquid cooling becomes the default for AI

TrendForce reports that liquid cooling penetration in high-end AI infrastructure is already above 50%. New GPU platforms are designed for liquid cooling from the start, so coolant delivery to the rack will be a standard question when choosing a data center.

4. Inference pulls infrastructure closer to users

JLL expects AI to represent half of all data center capacity by 2030. As inference dominates, latency and proximity matter more: models serving Vietnamese users should run in-country with multi-carrier connectivity (see what is an Internet Leased Line).

5. Data sovereignty and regulation

AI has become a matter of national strategy, driving sovereign infrastructure investment. In Vietnam, the Law on Digital Technology Industry (effective 1 January 2026) lists data center construction among specially incentivised investments, and the Personal Data Protection Law took effect on the same day.

What it means for Vietnam

What should businesses do now?

  1. Reserve a power roadmap: negotiate expansion rights for kW or adjacent racks in the contract (see the colocation contract checklist).
  2. Choose a high-density-ready facility: according to FPT, Fornix HCM02 offers an average 10 kW per rack and up to 60 kW per rack at peak.
  3. Check liquid-cooling readiness for your next GPU generation.
  4. Design multi-path connectivity and two-region DR (Ho Chi Minh City – Hanoi).
  5. Separate inference from training: inference close to users, training where power is available and affordable.
Planning GPU infrastructure for 2027–2029? Get in touch for advice on power, cooling and connectivity roadmaps at FPT Data Center.

Frequently asked questions

What is the biggest data center trend through 2029?

Power becomes the main constraint. The IEA expects global data center electricity use to reach about 945 TWh in 2030, and Gartner predicts 40% of AI data centers will be power-constrained by 2027. Alongside this, rack density rises sharply and liquid cooling becomes the default for AI.

What is a 600 kW rack and when will it arrive?

It is NVIDIA’s Rubin Ultra NVL576 rack on the Kyber architecture, liquid-cooled and planned for the second half of 2027 at about 600 kW per rack. NVIDIA is also moving its 800 VDC power architecture into production from 2027 to support racks of up to 1 MW.

How much will Vietnam’s data center market grow by 2030?

Vietnam has about 104 MW of data center capacity, forecast to grow five- to six-fold to nearly 600 MW by 2030.

How should businesses prepare GPU infrastructure for 2027–2029?

Reserve expansion rights in the contract, choose a facility that supports high density and liquid cooling, design multi-path connectivity and two-region DR, and model TCO under several electricity-price scenarios.