Power is the factor that determines both the price and the operability of a GPU rack. Estimate too high and you pay for power you never use; estimate too low and you run short when the GPUs hit full load. Here is a simple method any engineering team can apply.

Step 1: Get the maximum power of each server

Don't just add up the GPUs. A GPU server also has CPUs, memory, drives, network cards and fans. The most accurate figure is the "System power" or "Max power consumption" line in the manufacturer's datasheet.

Example: according to NVIDIA's datasheet, the DGX H100 system (8 H100 GPUs, 8U) draws about 10.2 kW at maximum.

If no system figure is available, estimate:

Server power ≈ (GPU count × TDP per GPU) + 1 to 2 kW for CPU, memory, fans, network

Step 2: Add up everything in the rack

Besides GPU servers, remember network switches, storage servers and management devices. Each high-performance switch can draw a few hundred watts.

Worked example

DeviceQtyEstimated power
4-GPU PCIe server22 × 3 kW = 6 kW
Network switch22 × 0.3 kW = 0.6 kW
Storage server10.8 kW
Total≈ 7.4 kW

The figures above only illustrate the method; replace them with your actual equipment specifications.

Step 3: Add headroom

Add roughly 10–20% as a safety margin for peaks and small additions. In the example: 7.4 kW × 1.15 ≈ 8.5 kW, which falls in the 6–10 kW/rack plan.

Step 4: Choose the plan and layout

Tip: if the total exceeds the plan, splitting equipment across two racks is sometimes cheaper and easier to cool than packing it into one.

Don't forget A/B power feeds

High-end GPU servers often have multiple power supplies. The DGX H100, for example, uses six load-sharing PSUs so it can keep running if some of them fail. In a data center, split the power cords evenly across the A and B feeds so the server stays up when one feed is under maintenance.

Summary

  1. Take the maximum power of each device from its datasheet.
  2. Add up all devices in the rack.
  3. Add 10–20% headroom.
  4. Match the result against the power plans and your expansion roadmap.

If you're unsure how many kW your configuration needs, send us your equipment list and we'll calculate it and propose a suitable setup.